We had the great pleasure of being able to supply our Grantex specialist dried aggregates to a large job for the Gypsy King, Tyson Fury’s mansion located in Morecambe, Lancashire.
The laying of the job was most ably completed by Grantex Stockist in Peterlee, Co. Durham – Total Resin Solutions. 1,200 bags of aggregate were supplied to the biggest job that Total Resin Solutions had done to date, taking a total of 15 days to complete in total.
Seven days were taken up with surface preparations and a further eight days laying the resin surface with a large team on the job. Luckily the weather held out, if arguably a little too warm to work in. This massive job also had commissioned a huge Gypsy King logo detail into the driveway. Tyson’s wife Paris was a little unsure at first about the bold statement being emblazoned on the drive, but after said she loved it too. So much so the family were photographed on the logo for Father’s Day photos.
The job was so popular it ended up being featured in both The Sun and The Mirror national newspapers as well as many online news outlets.
Supplier: Total Resin Solutions
Materials Used: Grantex Surfacing aggregates